top of page

Fire Protection and Suppression Projects

The systems will be required in accordance with the occupancy classification of the buildings, their respective risks, and their area, according to Fire Safety Standards.

FIRE PREVENTION - AVCB

Preventive measures using fire extinguishers;

 

Preventive treatment using automatic sprinklers;

 

Horizontal and vertical compartmentalization;

 

Fuel gas installations;

 

Emergency exits;

 

Protection against lightning strikes;

 

Emergency lighting;

 

Alarm and detection system;

 

Sign indicating abandonment of the premises.

Detailed Fire Protection Design Project - For Installation

Fire hydrants and extinguishers

Sprinklers

Flood System

Foam Combat

Water Spray

Emergency signage and escape route

Alarm, Conventional Detection, Wireless and Early Detection

Sprinklers (automatic showers)

Smoke control, pressurized stairwell.

Lightning Protection System (LPS)

Gas = development of gas projects, including: CNG (Compressed Natural Gas),

LPG gas.

Clean agents: FM200 - NOVEC - CO² .

©

© 2023–2026 PREVFIREHORN® – PFH Fire Protection Solutions Ltda – ME
Trademark registered with the INPI – Process No. 928005747. All rights reserved.

bottom of page